We were extremely happy to have the opportunity to work alongside Design Tonic LTD on this amazing project.
Our task? Install 18no Glass Walls and 24no aluminium door frames in this Vast open plan with offices and meeting rooms along considerable perimeter on the building.
Verona Tiles, Leeds.
Left, example of lower glass screen where 10 mm Toughened Glass can be installed .
Reducing noise by 35 decibels It’s enough to create comfortable and quiet working space in busy open plan office.
Verona Tiles, Leeds.
Verona Tiles, Leeds.
Most of the glass walls were over 2.71 m high.
12 mm Glass panes required in that case .
Timber doors to be installed soon after . . .
Verona Tiles, Leeds.
Interesting fact about the glass:
When Glass Breaks, the Cracks Move at 3000mph
That’s 5 times faster than the average airplane, which travels at 575mph!
Verona Tiles, Leeds.
It took 5 days to install 18 glass walls and 24 Aluminium door frames.
Lift all the material and tools up and down the first floor, manually lift 36 of 10 and 12mm panes of glass up first floor, install all the framework and door cases, install the glass in to the frame work and then clean all the glass walls and framework before we handed it over to main contractor.
Lead time as always stayed the same 10 days from surveying the project to start of installation.
Our projects:
If you think we would be a good addition to your New Office Glass Partition Wall project, don't hesitate to drop us a line or, call us direct by clicking one of the buttons below.
Thx for your time.
Best Regards
Team TW GLASS SCREENS.